Dear Students and Colleagues,
Please be informed that CMDO-Energy Section (ES) will conduct a cabling work at S8 U-Mall 1/F on 20-Nov-2020 (Fri). During the work period, a portion of false ceiling panels will be temporarily dismantled. Minor dust and noise may be generated. All entrances will be open as usual. For safety, some passages will be temporarily barriered. Please kindly pay attention to the on-site instructions when passing by these areas.
Furthermore, CMDO-Energy Section (ES) will conduct an electrical work on 21-Nov-2020 (Sat), from 08:00 A.M. to 10:00 A.M. During this period, there will be temporary power suspensions at S8 U-Mall public areas, for some short durations. The power suspensions will be carried out floor-by-floor, around 15 minutes each floor as listed below:
- S8 G/F public area, and B/F carpark lift lobby
- S8 1/F public area
- S8 2/F public area
During the power suspensions, the lighting service and air-conditioning service of the aforesaid public areas will be temporarily unavailable. The electric power for retails, escalators, service and cargo elevators will not be affected. Once the electric power is restored, the affected service will return to normal use.
For the detailed affected area, please kindly find the attached layout plan.
We sincerely apologize for any inconvenience caused, and thank you for your understanding.
Should you have any enquiries, please do not hesitate to contact our Mr. Ho (8822 8521 or 8822 8496). For any emergency during non-office hours, please contact Security Center at 8822 4126.
CMDO-Energy Section |